top of page

MIDSTATES ENERGY CO. PROJECTS

B9BCC449-76CB-428C-A0EF-07C96B4A5EA6.JPG

NEW ELECTRICAL SYSTEM

 

Thomas Hill Energy Center

Project included both the design and installation of a new electrical system for the Thomas Hill Energy Center, located in Missouri.

MSE PROJECT1A.JPG

SWITCHGEAR CHANGEOUT

 

Lhoist, Ste. Genevieve, MO

Removed existing 2500A switchgear and replaced it with new Siemens custom-made switchgear, with custom-made bus connection. The custom connection was built on site during a 24-hour outage.

MSE PROJECT 4.jpg

NEW ELECTRICAL SYSTEM

 

Pacificorp Hunter Plant, Castle Dale, UT

MidStates Energy was hired to install a completely new electrical system at the Pacificorp Hunter Plant, located in Castle Dale, Utah. This system was designed to reduce the emissions being generated there.

IMG_0419.jpeg

INSTALLATION OF VFD SYSTEM

 

Hannibal, MO

This project included the installation of a Variable Frequency Drive (VFD) System on pumps at a facility in Missouri. The VFD regulates speed of the pumps.

8D0FC8E5-B2A7-491E-A890-8DC8461EF022.JPG

POWER & CONTROL UPGRADE

 

Iowa Controls

This MidStates Energy project included a complete upgrade of a Power and Controls system for Iowa Controls.

MSE PROJECT2.jpg
MSE PROJECT3.jpg

NEW ELECTRICAL SYSTEM

 

Mill Creek Generating, Louisville, KY

MidStates Energy was hired to design and install a new electrical system in order to effectively reduce emissions that were being generated by the Mill Creek Generating Station in Louisville. 

TRANSFORMERS CHANGEOUT 

 

Calumet Energy, Chicago, IL

Change-out of Excitation, start-up frequency converter and low voltage transformers on both units at the facility in Chicago. Removed both line and load and control monitoring conductors, six dry type transformers and setting of new units.

MSE PROJECT 5A.jpg
MSE PROJECT 6.jpg

BREAKER REBUILD

 

New Madrid, MO

MidsStates Energy assisted ABB with a rebuild of 161KV HPL breakers  for M&A Electric, located at the New Madrid Power Plant. 

NEW GENERATOR AUX UPGRADE

 

AECI New Madrid, MO

MidStates Energy was hired to upgrade and install the Unit 2 generator auxiliary controls at New Madrid Power Plant, located in New Madrid, Missouri.

bottom of page